Safetyman Sentinel Suite 1.9.0 · RAMS / JSA / SWMS
Use this guide with the saved company revision and your organisation’s controls. Software approval records a named decision; it does not establish site safety, worker competence or permission to start work. The included example is fictional training material.
RAMS, JSA and SWMS are separate document purposes. Selecting a label does not establish that the document meets local requirements. Record the jurisdiction, applicable requirements, work scope and reasons for any high-risk construction classification. Use competent people to assess the actual site.
HSE describes method statements as a practical way to explain how work will be managed, drawing on risk assessment. Australian SWMS requirements concern high-risk construction work and depend on the applicable jurisdiction. WorkSafe Victoria explicitly distinguishes a SWMS from a risk assessment or JSA. Consult the relevant regulator and your organisation's requirements.
| Stage | What happens |
|---|---|
| Draft | The author develops the plan and steps. New revisions contain no approval decisions. |
| Submitted | The author requests review. Scope and steps are frozen. The reviewer may approve, or the author/reviewer may return it to Draft with a reason. Save the return before changing the content. |
| Approved | The independent reviewer records a decision. Approval is blocked if the review date has passed or linked preparatory actions remain incomplete. Approved content cannot be reset and overwritten. |
| In use | The author records pre-start checks and confirms evidence of all required briefings, including external workers. Their own account briefing must be acknowledged against this exact revision. Only one revision of the same document can be In use. The state is a record of the user's decision, not a permit issued by the software. |
| Suspended | The author or reviewer records why reliance on the plan has stopped. A suspended revision cannot return to In use; prepare a new revision for review and briefing. |
| Superseded | A linked successor must already be Approved or In use. Retain the previous content, steps, actions and acknowledgements. |
| Closed | Record the reason for closure. Keep the history and evidence. |
Use Record briefing against the exact saved Approved or In use revision. Each named account may acknowledge only its own briefing, dated today in UTC. Describe the controls discussed, questions and limitations. Save any attachments while the briefing is Draft. Once acknowledged, the record and its attachments are retained unchanged.
This release supports acknowledgements by users with assessment editing access. It does not provide an external-worker signature portal. Keep external worker briefing evidence separately and reference it in the pre-start readiness record. The system checks the author's acknowledgement; it does not independently confirm that every worker was briefed, is competent or is authorised to start.
Select Prepare next revision. This copies the planning content and steps into a new Draft, retaining the previous revision. Assign people again and review every control. Previous decisions, readiness assertions, attachments, briefing acknowledgements and action allocations are not copied. Add the current evidence and preparatory actions needed for the changed work. Suspend the previous revision where conditions make it unsuitable, then review and brief the new revision before use.
Export this revision downloads an HTML snapshot containing the plan, ordered steps, linked actions and revision briefings. Open it and choose Print / Save as PDF. The export clearly identifies its document reference, revision, status and export time. It may contain unsaved edits and is not a digitally signed issue. Check it against the saved company revision before distribution or use.
Add fictional RAMS / JSA / SWMS example adds an unassigned Draft RAMS for inspecting a segregated pedestrian route at a fictional dispatch bay. Three steps cover confirming segregation, inspecting the route and handing back the area. It is a training exercise, not a ready-to-use site assessment or a high-risk construction SWMS.
Desktop 2.1.3 does not support RAMS-focused workspaces. Use the web workspace or the matched Desktop 2.1.4 RC1 supplied by your administrator. Staging checks covered edited uploads, conflict resolution, revision downloads, evidence and existing Safety Case data. The desktop package is a portable release candidate, not a signed installer. The new server rejects saves that drop retained planning records, including Drafts. Older workspaces migrate with empty planning registers. Import reviewed content only after converting it into unassigned Draft material without approval or personal acknowledgement assertions.
Sources checked 31 October 2026. This guide describes the software and does not replace jurisdiction-specific advice or competent assessment.