DEMONSTRATION · Fictional company and records · Read onlyNo client data, sensor feeds or email alerts
Explore operational assurance
Follow Northbank’s fictional temporary-route change through observation, requirement review, competence and audit.
↻
Sentinel Change
Approve the change before exposure
Review operational changes, affected barriers, readiness and temporary-change expiry. Retain a named owner, independent decision and post-implementation review.
Plan audits, reuse approved checklists, sample evidence and record findings. Link actions and management reviews. These capabilities are also included within Assure.
How Sentinel connects incident reporting to control assurance
This fictional Northbank Engineering case begins with a dispatch-bay near miss. Sentinel Incident records the event and triage. Investigate links evidence, the timeline and Why Tree. Investigate Pro tests explanations and compares expected with observed barrier performance. Bowtie connects the reviewed finding to segregation and temporary-layout controls. Assure reviews inspections, delivery and effectiveness.
The report and investigation are distinct linked records. A review is required before a finding becomes a change to the risk model. Managed actions have a named authorised owner and an independent verifier; closure requires an effective outcome review.
All records are fictional. The public example is a fixed September teaching snapshot. The downloadable October practice assessment is a separate working copy with partly effective interim assurance and no live staff assignments.